What Matterport reported
Matterport’s December 2024 Wesbuilt Construction case study describes using digital twins with Procore for remote site review, project observations and ongoing documentation. The report also discusses a facility model for the handoff stage. Wesbuilt is an external industry example, not a Matterport Orange County client.
Our takeaway for an OC construction team
Define where the walkthrough belongs in your existing coordination process. Choose the capture milestones, record their dates and decide who maintains the links. If your team needs an integration or technical export, confirm its availability and scope before ordering. These are our suggested planning steps, not claims about an Orange County implementation.
Keep expectations specific
Wesbuilt’s reported results belong to its own projects and tools. A capture appointment alone does not reproduce that workflow. The cover is an original construction illustration and does not depict a Wesbuilt site.
Published industry source
Matterport: Wesbuilt Construction, Matterport and Procore
Plan your Orange County capture
Send the property address, approximate size, preferred date and the deliverables your audience needs. Discuss your project.